10A NCAC 14J .1731       COMPLIANCE REVIEW AND APPROVAL

(a)  The governing body shall submit copies of the following to the Section before it begins construction of a new municipal lockup and before it makes additions or alterations to an existing municipal lockup as defined by the North Carolina State Building Code:

(1)           three sets of schematic drawings and outline specifications;

(2)           three sets of preliminary working drawings or design development drawings and outline specifications;

(3)           three sets of completed final working drawings and specifications.

(b)  Upon receipt of the drawings and specifications at each stage, the Section shall send one set each to the following for their review and approval:  the Department of Insurance to insure compliance with the North Carolina State Building Code, and the Division of Environmental Health in the Department of Environment and Natural Resources to insure compliance with the rules governing sanitation as codified in Title 15A Chapter 18A Section .1500 and which are hereby adopted by reference pursuant to G.S. 150B‑14(c).  The Section shall keep one set for its own review and approval to insure compliance with the minimum standards for the operation and construction of municipal lockups as contained in this Subchapter.  Review and comment on the drawings and specifications at each stage shall be made no later than 30 days after receipt by the Section.

 

History Note:        Authority G.S. 153A‑221;

Eff. June 1, 1990;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. January 5, 2016.